Data Centers Aren’t the Villain. The Deal We Gave Them Is.

Every time you ask a chatbot a question, stream a show, or back up your phone, a building somewhere works a little harder. That building is a data center. For years, almost nobody thought about them. Now they show up in town hall fights, campaign ads, and monthly power bills.

My view is simple. We need data centers, and we will need many more of them. But too many have been built under a deal that asks regular people to carry costs that belong to some of the richest companies on Earth. That needs to change, and the good news is that the fix is already within reach.

The Hunger Is Real

Let’s start with the numbers, because they are huge. Gartner (2026) forecasts that global data center electricity use will reach 565 terawatt hours this year, up from 447 terawatt hours in 2025, a jump of about 26%. The firm expects total use to pass 1,200 terawatt hours by 2030. That is more than double this year’s figure in just four years.

AI is the main driver. Gartner estimates that AI-optimized servers will account for 31% of data center power use in 2026, and that by 2027 they will use more power than conventional servers. In the United States, the U.S. Energy Information Administration (2026) says electricity demand is on track for its strongest four-year growth streak since 2000, largely because of data center expansion. That is a big change for a grid that spent years with fairly flat demand.

Why Neighbors Are Pushing Back

The first worry is water. A typical data center uses about 300,000 gallons of water a day, roughly what 1,000 households use, according to The Fulcrum (2026). Very large facilities can use around 5 million gallons a day, similar to a town of 10,000 to 50,000 people. In dry regions, that is a serious ask.

The second worry is money. As NPR (2026) reports, one estimate finds Maryland customers pay roughly $168 to $216 more per year on their power bills, mainly because of the data center boom. PJM’s Independent Market Monitor estimates data centers have cost the grid operator’s 67 million ratepayers about $29 billion over roughly two years. To be fair, the same report notes that not every recent price increase is linked to data centers.

People have noticed. A Gallup poll cited by the Coeur d’Alene Press (2026) found that 71% of Americans opposed having an AI data center built in their area. Local action is following. In San Marcos, Texas, the city council removed data centers as a permitted use in a redevelopment plan after organized pushback from residents worried about water in drought-prone Hays County. These aren’t people who hate technology. They are people doing math at the kitchen table.

The Real Problem Is Who Pays

Here is the heart of it. When a utility builds new power plants and transmission lines to serve a giant data center, then spreads that cost across every customer, a retiree on a fixed income ends up helping fund a tech giant’s expansion. That is backwards.

Data centers bring real benefits, including construction jobs, tax revenue, and the computing power behind tools millions of people use every day. But a good investment should be able to stand on its own. If a project only works when households quietly cover part of the bill, it isn’t a good deal for the town.

The Fix Is Already Here

The encouraging part is that regulators are catching on. According to Axios (2026), the Smart Electric Power Alliance counts 60 electric utilities in 36 states that have created large load tariffs. These are special rate rules that make the biggest power users cover the costs they create.

Pennsylvania offers a strong example. The Pennsylvania Public Utility Commission (2026) voted 5-0 to adopt a model tariff under which the costs of grid upgrades needed to connect large customers will be recovered directly from those customers. The model serves as nonbinding guidance for utilities, so the real test will be how firmly it is applied.

Technology is helping on water, too. Construction Executive (2026) reports that Microsoft’s closed-loop cooling design can save more than 33 million gallons of water per data center each year, with pilot sites in Phoenix and Mt. Pleasant, Wisconsin, expected to come online in 2026. Oracle (2026) says its newer AI facilities use sealed, direct-to-chip cooling loops that are filled once, making ongoing community water use for cooling effectively zero. There is a trade-off, since these systems may slightly increase energy use. Still, it proves that thirsty data centers are a design choice, not a law of nature.

Three Rules for a Better Deal

First, data centers should pay their own way. Every new power plant, power line, and substation built to serve them should be paid for by them, not by families and small businesses.

Second, water numbers should be public before any vote. In Texas, experts told KLTV (2026) that data centers have not been answering the state water board’s surveys, which makes their future water use hard to estimate. No town should approve a project without knowing exactly how much water it will use.

Third, low-water cooling should be the standard in places where water is scarce. If the biggest companies can build facilities that barely touch local water, there is little reason to accept anything less in a drought zone.

Data centers are the factories of the AI age. We shouldn’t run them out of town, and we shouldn’t hand them a blank check either. Get the deal right, and communities can welcome them as good neighbors instead of fighting them as unwanted guests.